Rules:
  1. Rule 1.
  2. Please use a "*" or "nm" in the subject line to denote topic only posts.
  3. Any post or attempt to take things "off the board" will result in a ban. Do not use other poster's real names or personal info.
  4. Fire Kyle Whittingham.

Admins - Rich, BBA, Nikos
Ceremonial Moderator - the wino
Moderator Emeritus - Beave
Honorary Moderators - BigLake, Blue Man

POTY - Craig

📌 To register, email victardgoblue@gmail *

1 day since our last humiliation · WARDE ETERNAL

Fire Everyone

Post a New Message

Looking for some expectations, regarding a retaining wall and city permit

Posted on by WolvBlue

For reference, we live in the city limits of a major Atlanta suburb. We've been through the permitting process before, having poured a new driveway. We recently had a block wall built that is really more decorative than actually retaining anything. It's 30 inches high and out front, against the sidewalk. We had it professionally done, with a contractor that has been in business for 20 years, it's actually really great with some lighting and everything.

Key here is we obtained a permit with the city that had a drawing attached of our property and where the wall was. After a good bit of back and forth, the drawing was officially approved and the permit was granted. We specified 80" from the street, plainly labeled on the drawing.

Today they come out to do the inspection. We get a photograph of the inspector's arm and a tape measure stretched out to some distance under 12 inches into our yard with the message that we encroached on the city right of way. I double checked the dimensions and we ended up 84" away from the street instead of 80 (so, 4" better).

The email had the inspector and his phone number and took our permit down but did not post a stop work or anything like that. To emphasize, the wall was built to the specifications approved in the permit.

Any idea what we're going to have to do? My wife is very worried we'll have to tear down our wall and wants me to call first thing in the morning. What if I don't call? They didn't demand it. I feel like at worst we'll need to sign something that says if they need that land for something we're at risk of losing the wall. Something in between? I'm also aware as the city they can basically do whatever they want. Anyone go through this before?

Back to the board

Thread:

Log in to reply.

Probation ends …