Here's the sequence: decided we wanted the wall. Got in touch with a contractor we knew and got an estimate. Contacted the city about a permit, submitted an initial drawing, went back and forth a couple of times to satisfy all the reviewers of the permit. Finally agreed on a drawing which included property lines, distance from street, disturbed soil, mitigation methods, distance to utilities, etc. Permit and drawing approved by city. Permit posted. Contractor started wall, built wall within specifications. Inspection scheduled, inspection happened. Notice of encroachment given after inspection.